{"id":1189,"date":"2016-11-01T14:57:33","date_gmt":"2016-11-01T21:57:33","guid":{"rendered":"https:\/\/nuzeal.com\/?p=1189"},"modified":"2016-11-01T14:57:33","modified_gmt":"2016-11-01T21:57:33","slug":"australia-spectrum-news","status":"publish","type":"post","link":"https:\/\/nuzeal.com\/index.php\/2016\/11\/01\/australia-spectrum-news\/","title":{"rendered":"Australia \u2013 Spectrum News"},"content":{"rendered":"<p><a href=\"https:\/\/i0.wp.com\/nuzeal.com\/wp-content\/uploads\/australia.png?ssl=1\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-814\" src=\"https:\/\/i0.wp.com\/nuzeal.com\/wp-content\/uploads\/australia.png?resize=191%2C100&#038;ssl=1\" alt=\"australia\" width=\"191\" height=\"100\" \/><\/a>ACMA have three consultations in progress concerning spectrum auctions and future spectrum planning:<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"http:\/\/www.acma.gov.au\/theACMA\/700-mhz-spectrum-unsold-lots-auction\" target=\"_blank\">700 MHz spectrum: unsold lots auction<\/a><\/p>\n<p>In 2013 the ACMA held the digital dividend auction which offered 2&#215;45 MHz of spectrum (703\u2013748 and 758\u2013803 MHz) in the 700 MHz band (the digital dividend).<\/p>\n<p>Following the auction, 2&#215;15 MHz of 700 MHz spectrum remained unsold (the unsold 700 MHz lots). The ACMA&#8217;s allocation procedures for the digital dividend auction provided that any unsold 700 MHz spectrum lots might later be offered for allocation by a procedure and at a time, to be determined by the ACMA.<\/p>\n<p><a href=\"http:\/\/www.acma.gov.au\/theACMA\/future-use-of-the-15-ghz-and-36-ghz-bands\" target=\"_blank\">Future use of the 1.5 GHz and 3.6 GHz bands<\/a><\/p>\n<p>The 1427\u20131518 MHz band (the 1.5 GHz band) and the 3575\u20133700 MHz band (the 3.6 GHz band) are currently included in the initial investigation stage of the ACMA&#8217;s mobile broadband (MBB) work program.<\/p>\n<p>Consideration for the use of both the 1.5 GHz and 3.6 GHz bands for MBB services has progressed internationally in the International Telecommunication Union\u2013Radiocommunication Sector (ITU-R), Asia\u2013Pacific Telecommunity (APT) and in individual countries around the world. The progress of this consideration means it is timely to consider the potential re-planning of these bands in Australia.<\/p>\n<p>The main intention of the discussion paper is to determine whether consideration of the 1.5 GHz and 3.6 GHz bands should be progressed to the preliminary re-planning stage of the ACMA&#8217;s process for consideration of additional spectrum for MBB services.<\/p>\n<p><a href=\"http:\/\/www.acma.gov.au\/theACMA\/five-year-spectrum-outlook-2016-20\" target=\"_blank\">Five-year spectrum outlook 2016\u201320<\/a><\/p>\n<p>The Five-year spectrum outlook (FYSO) provides an annual overview of the ACMA&#8217;s spectrum management priorities and issues over the near to medium term, and its plans to address them. Stakeholders can use the document to identify when the ACMA expects a particular work program to commence, and to understand the priority applied to particular activities by the ACMA.<\/p>\n<p>Will impact the spectrum allocated for various services and devices, especially 5G, IoT, WLAN (RLAN) and other Low Interference Potential Devices (LIPD).<\/p>\n","protected":false},"excerpt":{"rendered":"<p>ACMA have three consultations in progress concerning spectrum auctions and future spectrum planning: &nbsp; &nbsp; 700 MHz spectrum: unsold lots auction In 2013 the ACMA held the digital dividend auction &#8230;<\/p>\n","protected":false},"author":1,"featured_media":814,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[3],"tags":[21,22,5,12],"class_list":["post-1189","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-compliance-news","tag-5g","tag-iot","tag-srd","tag-wlan"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/nuzeal.com\/wp-content\/uploads\/australia.png?fit=191%2C100&ssl=1","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/nuzeal.com\/index.php\/wp-json\/wp\/v2\/posts\/1189","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nuzeal.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nuzeal.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nuzeal.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/nuzeal.com\/index.php\/wp-json\/wp\/v2\/comments?post=1189"}],"version-history":[{"count":3,"href":"https:\/\/nuzeal.com\/index.php\/wp-json\/wp\/v2\/posts\/1189\/revisions"}],"predecessor-version":[{"id":1199,"href":"https:\/\/nuzeal.com\/index.php\/wp-json\/wp\/v2\/posts\/1189\/revisions\/1199"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nuzeal.com\/index.php\/wp-json\/wp\/v2\/media\/814"}],"wp:attachment":[{"href":"https:\/\/nuzeal.com\/index.php\/wp-json\/wp\/v2\/media?parent=1189"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nuzeal.com\/index.php\/wp-json\/wp\/v2\/categories?post=1189"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nuzeal.com\/index.php\/wp-json\/wp\/v2\/tags?post=1189"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}